How Data Center Scout Verifies Colocation Availability

A map pin is not capacity. This is the standard we use before describing a facility option as available and before comparing its economics with another proposal.

Policy reviewed July 24, 2026

How recent must a confirmation be?

Capacity is requirement-specific and can change quickly. We show the date of the provider response whenever an option is presented as confirmed. Before a buyer relies on an option for a decision, we reconfirm material capacity, pricing and delivery details. A page-review date or market report date is not presented as facility verification.

Our freshness rule

If an option has not been confirmed for the buyer's current kW, density, cooling and date, it is labeled “provider confirmation required” or “pending,” not live.

What “available” means

Available means the provider has identified a specific operating space or credible future phase that can serve the defined requirement, subject to stated commercial and customer dependencies. The record should include footprint, usable power, density, cooling, redundancy, delivery, expansion status and quote validity.

Empty floor area, unused building capacity, utility capacity at a campus or a press release about future development does not qualify by itself.

How usable kW is verified

  1. State the required continuous IT load and growth by date.
  2. Identify what the provider's quoted kW represents: circuit, UPS, reserved, metered or usable IT load.
  3. Confirm A/B topology, breaker loading, operating headroom and any diversity assumption.
  4. Verify that power can be concentrated across the actual rack layout.
  5. Record customer-side work, distribution equipment and commissioning requirements.

How cooling capability is classified

ClassificationWhat must be confirmed
Standard airSustained rack kW, supply conditions, airflow path and containment assumptions
Engineered high-density airRack concentration, containment, fan and return-air design, plus operating limits
RDHx-readyFacility-water availability, temperatures, pressure, redundancy and ownership boundary
Direct-to-chip-readyPrimary and secondary loops, CDU, fluid, controls, leak response, commissioning and maintenance
Liquid-capable, design pendingThe provider supports a liquid design in principle, but the buyer design has not passed engineering review

How pricing is normalized

We separate recurring and one-time charges, then align proposals to the same usable IT kW, term and ramp. The comparison includes cabinet or suite cost, power basis, A/B design, bandwidth, cross-connects, remote hands, installation, utility or PUE pass-through, taxes when supplied, escalators and renewal treatment. Assumptions and exclusions remain visible.

Provider compensation

Data Center Scout is powered by Bridgepointe Technologies. Our commercial model may include compensation from the provider selected by the buyer. Buyers should ask your scout about the relationship and compensation path for any shortlisted provider. A provider's willingness or ability to compensate us should not be treated as proof that it is the best technical or commercial fit.

When buyer details are shared

We can discuss a requirement in general terms before identifying the buyer. Buyer-identifying details should be shared with a provider only when needed to validate or quote an option and with the buyer's permission. The minimum practical information is used. Site visitors should also review the privacy notice.

How conflicts of interest are handled

  • Separate verified facts from estimates, assumptions and provider marketing
  • Disclose a material commercial relationship when it could affect the comparison
  • Use the buyer's written requirements as the scoring baseline
  • Show meaningful technical, delivery and commercial exceptions
  • Include non-compensating options when they are known and materially better suited
  • Let the buyer make the final provider decision

What buyers receive

A useful shortlist is not a directory export. It identifies the option, verification date, usable kW, density and cooling fit, delivery dependencies, expansion path, normalized recurring and one-time cost, and open questions. If a fact has not been confirmed, it remains labeled as unverified.

Ask for a shortlist you can audit.

Bring the actual requirement and we will show what is confirmed, what is estimated and what still needs provider engineering.